Bowbridge Primary School, Newark upon Trent, Nottinghamshire
Design, Supply and installation of a new build 2 storey block to an existing primary school, 70 m long x 15m wide with a composite glulaminated timber column and beam support framework with Structurally Insulated Panels (SIPS) forming internal and external shear walls and complete with glulaminated timber lamella roof with SIPS roofing panels acting as a composite diaphragm.
Contract value: £850,000
Client: Marriott Construction
Specialist Subcontractor: ECC Timber Engineering Ltd
Specialist Manufacturer: ECC Timber Engineering Ltd & Cowley Timberwork joint venture.
Project Data
Please Click the above link to download a PDF document of our company profile.

